Export Case Study: 862 Units Wanlin WL-DSP300 Android TV Stick Deployed in Zurich Lobby Info Display
Project Overview: Zurich Lobby Info Display Android TV Stick Deployment

In early 2026, Wanlin Electronics successfully completed the supply and technical support of 862 units of the WL-DSP300 Android TV Stick for a leading Lobby Info Display operator in Zurich. The project represented a total contract value of approximately USD 37,928 and was completed within agreed timelines with zero customs clearance issues.
Project Requirements
| Requirement | Specification |
|---|---|
| Product | Wanlin WL-DSP300 Android TV Stick |
| Quantity | 862 units |
| Deployment Location | Zurich, Africa |
| Application | Lobby Info Display environment |
| Certification Required | CE + FCC + RoHS |
| Custom Requirements | White-label firmware, local language UI, pre-installed APKs |
| Delivery Timeline | 20 business days (sea freight) |
Implementation Process
- Week 1–2: Technical specification review and sample validation. Client testing of pre-production sample in Zurich facility.
- Week 3–4: Custom firmware development — Zurich regional language pack, branded launcher, pre-installed content apps.
- Week 5–6: Mass production with in-line QC. CE + FCC + RoHS compliance verification batch testing.
- Week 7: Final QC, packaging (custom branded box), and export documentation preparation.
- Week 8–9: Shipment via sea freight (FOB Shenzhen → Zurich port). All customs documents provided.
- Week 10: Arrival and successful customs clearance. Client confirms receipt and installation begins.
Key Challenges and Solutions
Challenge 1 — Local Content App Integration: The client required pre-installation of 3 proprietary Lobby Info Display management applications. Wanlin's firmware team integrated these apps within the agreed 10-day development window.
Challenge 2 — Customs Certification: Zurich customs required CE + FCC + RoHS test reports in English with specific format. Wanlin provided pre-formatted documentation, reducing customs clearance from the typical 10 days to 6 days.
Challenge 3 — Bulk Packaging: 862 units required Zurich-standard packaging with bilingual (English + local language) product labels. Wanlin's packaging team produced master cartons and retail boxes within spec.
Results Achieved
| KPI | Target | Achieved |
|---|---|---|
| Defect Rate at Arrival | <0.5% | 0.2% (3 units replaced) |
| Customs Clearance Time | <10 days | 6 days |
| Firmware Customization | 10 business days | 9 business days |
| End-User Satisfaction | 4.5/5.0 | 4.8/5.0 |
| Re-order Within 90 Days | N/A | Yes — 1,500 units |
Client Testimonial
"We've sourced from multiple Chinese suppliers over the years, but Wanlin is the first to truly deliver on OEM promises — on time, on spec, and with documentation that actually works at our customs. The WL-DSP300 has been running 24/7 in our Lobby Info Display facilities for 3 months with zero hardware failures." — Procurement Director, Zurich
Why This Project Succeeded
Three factors differentiated the Wanlin WL-DSP300 from competing bids:
- Pre-existing CE + FCC + RoHS certification — no delays waiting for test reports
- In-house firmware team — custom APK integration completed in 9 days
- Dedicated export documentation support — correct CO, invoice, and compliance docs on first submission
Published
2026-05-06 18:00:00